Fourth quarter chemical industry demand will remain stable year-on-year or significantly improved

In September, the industrial added value of chemical raw materials and chemical products manufacturing industry increased by 21.4% year-on-year, and the growth rate reached a record high in two years. The cumulative increase from January to September was 10.50% year-on-year, which is also the highest increase since this year. Experts pointed out that since 2009, the economic boom of the downstream industry has driven the recovery of all sub-sectors of the chemical industry, and many chemical products have risen in price. In the fourth quarter, the development of the industry will remain stable, but the year-on-year will be significantly improved.

Since the beginning of this year, chemical downstream industries have recovered strongly. The dramatic increase in car sales has driven the demand for tires, carbon black, modified plastics and other chemical sub-sectors; the boom in the real estate market has led to increased investment, so that the demand for soda ash, silicones, and PVC has improved; the recovery of the textile industry has activated the upstream chemical fiber industry. In the industrial chain, the demand for chemicals such as dyes and auxiliaries has also greatly increased.

October is still the peak season for most industrial chemicals. From November to December, the construction activity in some northern regions slowed due to the weather, and the demand may decline seasonally. As a whole, industry demand remained stable in the fourth quarter compared to the same period of last year. As the fourth quarter of 2008 was a period of collapse in the demand for chemicals, inventory and price system, the industrial chemicals industry in the fourth quarter of this year will see a significant year-on-year improvement. The main driving factors for the improvement of the agrochemicals are the increase in prices of agricultural products and commodities. Domestic overcapacity and export obstruction have led to a drop in the prices of nitrogen fertilizer (urea) and phosphate fertilizer, which have basically bottomed out. However, the increase in the economy requires an increase in the prices of international agricultural products to drive up demand for fertilizers.

Stainless Steel Elbow
1) Material: Stainless steel304, 316L
2) Size: 1/2"-8"
3) Standard: DIN, SMS, ISO, 3A, RJT
4) Structure: Elbow
5) Connection Way: Clamp,weld,thread,flange
6) Standard: JIS, DIN, ASTM, SMS, ISO, 3A
7) Packing: wooden case or according to customers request
8) Type: Long type, short type & 90 degree, 45 degree, 180 degree etc
9) Application range: Dairy, food, beer, beverage, pharmacy, cosmetic, etc

10)Surface finish: Mirror, matte type as per requirement

 

Sanitary Elbow

 

FAQ:
1.Are you a trader or manufactory?
 We are a manufactory (Own Forging workshop and CNC machining workshop )
 
2.Can your products reach to FDA , CE and 3A requirements?
Yes, all of our material can reach to the requirements of FDA, ISO and 3A Certificate).


3.We can supply:
Sanitary Butterfly Valve, Sanitary Check Valve and Diaphragm Valves, as well as Various Tank Accessories:  Sight Glass, Strainers/Filter, Cleaning Ball, And other Pipe Fittings, (Pipe Unions: SMS, DIN, IDF, RJT, 3A,DS; Fittings: Ferrule,Elbow, Tee, Reducer and all other Non-standrad fittings), each products are tested well by our strictly Quality Control System, and we also have excellent service to support you and promote your business.
 
4.Lead Time:
For large quantity, as usual, it can be sent out within 20-40 days.
Small parcel will be dispatched by DHL, FedEx, UPS OR TNT Courier.
Big cargo will be delivered by Air freight or By Sea.
 
5.Our Service:
About payment:
Payment methods: L/C, T/ T, Paypal,Western Union


6.About samples:
We can provide samples production and service. Usually 2 to 5 days, the sample can be sent to your hands. We will choose the shipping way as you required: By sea, by air or by express. Any question about samples, please contact us.


7.For OEM products:
We will finish the production within 20-40 days after payment has been confirmed.
About delivery and shipping:
We will choose the delivery way as you required: By sea, by air, by express ect. Save your cost is our mission.


8.Warranty:
Any question or problem will be respond within 12 hours.


9.Lifetime service:
Any problem happened to our product, we will do our best to help client to solve it, spare parts will be half price in lifetime.


10.Problem solve:
If you can't solve the problem in your local, please delivery the product to us, we will repair it and then back to you.


11.Quality control:
All the products are calibrated with real working condition, and tested before shipping as qualified product.


12.Purpose:Attitude is everything.

Sanitary Elbow

Sanitary Elbow,Sanitary Reducer,Sanitary Tee,Sanitary 4 Way Cross

Wenzhou Qili Fluid Equipment Co., Ltd. , http://www.qlssvalve.com