Still alarm fire in Schiller Park 7-18-19

This message is from Mike Lopina:

While driving north on I-294, I noticed a fire alert and heard traffic reports indicating a fire on or in the roof of a building. The structure at 10511 W United Parkway is a one-story non-combustible building measuring 350 feet by 150 feet. From the tollway, it looked like the fire could escalate to an extra alarm, but by the time I arrived (about 10 minutes later), the fire had already been extinguished.

The responding units did an excellent job containing the fire to just the rooftop HVAC unit and some spread to the roof deck. Units involved included Schiller Park Engine 5, Tower Ladder 5, Ambulance 5, and Battalion 5, along with Franklin Park Truck 2, Leyden Quench 133, Norwood Park Engine 101, and Franklin Park Battalion 490.

It was impressive to see how quickly the crews responded and handled the situation, especially considering the extreme heat. Great work by all the firefighters on scene!

Mike Lopina

Schiller Park fire scene

Mike Lopina photo

Franklin Park Fire Department

Mike Lopina photo

Schiller Park Fire Department

Mike Lopina photo

Franklin Park Fire Department

Mike Lopina photo

Schiller Park Fire Department

Mike Lopina photo

Franklin Park Fire Department

Mike Lopina photo

Schiller Park Fire Department

Mike Lopina photo

Norwood Park Fire Department

Mike Lopina photo

Concrete Pump

Concrete Pumps which are being used to deliver the ready-mix concrete to any point in the jobsite.
It is most suitable for the houses and commercial buildings above 30 floors small bridges water conservancy power and communication project.
Oil pump is driven by diesel engine and produce hydraulic pressure using the hydraulic pressure driving oil cylinder for reciprocating motion the concrete piston suction or delivery action.
Our Concrete Pumps are equipped with axle and tires. Thus it can be easily towed and transported to required points. Moreover the concrete delivery pipes can be easily assembled and become ready to deliver concrete.
The use requirements and matters needing attention:
1) Before using the machine check the condition of engine oil and coolant to ensure no shortage of oil and coolant in the process of using.
2) run time note: when start the diesel engine if it has not started within 15 s you should repeat it after 2 minuts.Diesel engine should be idle running 2-3 min after starting then be normal work.and oil pressure should be higher than 120 kpa in that time.



Concrete Pump,Concrete Truck,Concrete Delivery Pump,Electrical Concrete Pump

Zhengzhou XinFeng machinery manufacturing Co. Ltd , https://www.xinfengmachinery.com